Skip to main content

Welcome to the new iris.ma

We rebuilt everything for you

Same team, same standards

Pay nowView my order
Visit the Schneider Electric store

Schneider Electric Easy UPS 3S 20 kW / 20 kVA Online UPS (E3SUPS20KHB1)

Fifteen minutes of runtime at full load, internal batteries included. Dust filter and conformal-coated boards: it is made for demanding premises, on a three-phase 400 V input tolerated from 304 to 477 V.

  • Runtime: around 15 minutes at full load (20 kW)
  • Internal batteries included: 2 strings of 7 Ah, expandable to 3 for more runtime
  • Three-phase 400 V input and output, also 380 or 415 V
  • Terminal block connection: fixed wiring, to be installed by an electrician
  • Input voltage accepted from 304 to 477 V
  • Dust filter and conformal-coated electronic boards for demanding environments
  • USB port; network management card optional for remote monitoring
  • Harmonic distortion below 3% on the input as on the output
  • Output voltage regulated to ±1.5%
  • Maximum input current of 37 A per phase
  • Active ventilation: 60 dBA, to be installed in an electrical room
  • Cabinet 140 cm high, 446 kg without batteries
  • Delivery usually within 6 weeks
Ref.: E3SUPS20KHB1
92 399,00 DHincl. VAT

Limited quantity

Earn 300 DH in loyalty credit with this purchaseHow does it work?Loyalty credit capped at 300 DH per order.

Receive it between Wed 23 Sept and Fri 25 Sept — delivery 1 000 DH incl. VAT all over Morocco

Delivery to your address

Receive it between Wed 23 Sept and Fri 25 Sept — delivery 1 000 DH incl. VAT all over Morocco

The estimate is refined using actual delivery rounds to your city.

  • Free delivery from 3 000 DH of purchases, all over Morocco.
  • Below that, the same rate in every city for parcels up to 30 kg (delivery to your home or workplace) — the exact amount is shown above, then in the basket.
  • Above 30 kg, the rate follows the parcel's weight. In Casablanca, the flat rate holds up to 120 kg.
  • You are notified by SMS, then called by the courier before your parcel is handed over (delivered by Sapress).
  • Observed delivery time: 1 to 5 working days depending on the city.
Free in-store collection: Casablanca (within 24 h) · Témara (within 48 h)

In-store collection — free

Casablanca store
We bring it to the store within 24 h
We call you as soon as it arrives in store.

Résidence Manoir des Roses, Lot. 18, Boulevard El Hachmi El Filali, Rond-point Bachkou, Casablanca

Opening hours

  • Mon–Fri: 10am – 7pm
  • Sat: 10am – 2pm
  • Closed on Sundays and public holidays

Payment on site: cash, bank card via terminal, certified cheque.

View the map on Google Maps

Temara pickup point
We bring it to the store within 48 h
We call you as soon as it arrives in store.

Boulevard Hassan II, Résidence Les Perles de Témara, Immeuble 5, appartement 2, Témara

Opening hours

  • Mon–Fri: 8.30am – 1pm / 2pm – 6pm
  • Sat: 8.30am – 12.30pm
  • Closed on Sundays and public holidays

Payment on site: cash, bank card via terminal, certified cheque.

View the map on Google Maps

1 year warranty — free repair in Morocco if it breaks down during the warranty period

1 year manufacturer's warranty

This product is covered for 1 year by a manufacturer's warranty (the brand's official warranty). Your iris.ma invoice serves as the warranty document: keep it safe.

A problem with your product? Don't worry: contact us by phone, WhatsApp or e-mail. Depending on the brand, we direct you either straight to the repairer appointed by the brand to fix your product, or to us — and we take care of the rest.

  • If a repair is possible, it is carried out free of charge.
  • If the product cannot be repaired, the brand offers an exchange for another product.
  • If no product is available, a refund is issued as soon as the brand confirms it.

Faulty straight out of the box? Some brands offer an immediate exchange, others a repair. Contact us to find out what applies to your product.

The warranty covers breakdowns occurring under normal use, as defined by the brand's terms. Product breakage (drop, impact, liquid…) is not covered, nor are certain consumable parts.

New, never opened — our commitment

All our products are new, delivered in their sealed original packaging.

We commit to never sending you a product that has been opened, unboxed or returned by another customer — even one “just opened for checking”.

Any doubt on delivery (damaged box, seal already opened)? Point it out to the courier or contact us immediately: we take the product back and send you another one.

Sales invoice

Every order comes with its sales invoice, included with the parcel (handed over in person for a store collection).

Ordering for a company? Using the details you give at checkout (company name and ICE), the invoice is issued in your company's name, with its ICE.

Need a quote? Request a free quote — reply within 24 working hours.

100% secure payment: Bank transfer · Bank card · Certified cheque

Accepted payment methods

Bank transfer

Simply transfer the amount shown to account 007 826 0002684000000426 89 — SGM2I, Attijariwafa bank. The rest (the reference to quote, sending us the proof, tracking) is explained right after confirmation and by email. An instant transfer is recommended: it saves you 24 hours on the delivery time.

Bank card

Your everyday Moroccan bank card is enough — Visa, Mastercard or CMI, no special card required. Foreign cards are accepted too. Secure payment by Attijari Payment.

Certified cheque

Certified cheque payable to “sgm2i”. Have your bank certify the cheque, then send us a copy on WhatsApp (+212 6 64 10 46 24) or to service.client@iris.ma — we dispatch as soon as we receive it.

The methods offered depend on the order total and the carrier — checkout shows the final list.

Google reviews4.7(553 reviews)
Manufacturer's datasheetView the PDF · 248 Ko — downloadable

Product overview

Very high-power three-phase online UPS for critical infrastructure: online double-conversion, 20 kW / 20 kVA.
Technology & protection: power is fully regenerated, continuously — equipment never touches the mains, with zero transfer time. Maximum protection against power cuts, surges, voltage fluctuations and electrical noise.
Power: 20 kVA for 20 kW of usable power (power factor of 1) — all of the rated power available in watts, for several server racks.
Runtime: approx. 15 minutes at full load (20 kW).
Ports: three-phase terminal block connection (fixed wiring by an electrician).
Designed, for example, for data centres and critical business infrastructure.
Remember to check how much power your equipment draws and to choose the capacity according to the runtime you need.

See all the specifications ↓
Request a quote

Be notified of a price drop

Share:

Technical specifications

Technical specifications
Output voltage400 V AC three-phase (others: 380 V, 415 V)
Output harmonic distortion< 3% at linear load
Output connectionsThree-phase terminal block (3P + N + G), typical
Input voltage400 V AC three-phase (limits 304 … 477 V)
Input frequency45 … 65 Hz
Input connectionsThree-phase terminal block (3P + N + G)
Voltage range304 - 477 V
Battery typeInternal sealed lead-acid (VRLA), 240 V bus
Interface port1 USB port
Weight (kg)446 kg (excluding batteries)
Dimensions (W x D x H) (mm)380 x 928 x 1,400 mm
TechnologyOn-line
Power (VA)20,000 VA
Voltage stabiliserYes
Box contentsDust filter · Installation guide
Technical specifications (continued)
Preinstalled batteries2
Communication card slot1 network card slot (Network Management Card 3, optional)
Transfer/switching time0 ms (continuous double conversion)
Audible noise60 dBA
Power factor (ratio)0.9 capacitive to 0.9 inductive
Input power factor0.99
Output frequency50 Hz or 60 Hz, synchronised to mains
Phase (output/input)Three-phase / Three-phase
Output typeTerminal block
Power (W)20,000 W
Runtime~15 minutes at full load (20 kW)
Form factorTower
Control & communicationUSB, Card slot
Warranty1 year

Customer reviews

No reviews yet

Be the first to review this product and help other customers.

Write a review
Your rating
5/5

Shown publicly with your review.

Never published — a confirmation email will be sent to you.

Tell us about the product — in a few lines:

  • what you liked in everyday use;
  • the quality and performance you found;
  • who you would recommend it to, and why.

A question about an order, a delivery or a payment? Write to us and we will reply to you directly.

Under Law 09-08, you have the right to access, rectify and object to the processing of your personal data. This processing has been authorised by the CNDP under no. D-CE-389/2015. Learn more

Frequently asked questions about this product

How long does the Easy UPS 3S 20 kVA run on battery?
About 15 minutes at full load, i.e. 20 kW, with the internal batteries. This is the runtime stated at maximum load: at partial load it is longer, and the unit accepts an additional battery string to extend it further.
Does the Easy UPS 3S 20 kVA require a three-phase supply?
Yes: input and output are both three-phase, at 400 V — also 380 or 415 V — on a 3-phase + neutral + earth terminal block. Input current reaches 37 A per phase: the feeder circuit at the distribution board and the cable cross-section must be sized accordingly.
What makes this UPS suitable for a harsh room?
A dust filter — included — and coated electronic boards protected by a conformal varnish. Both are explicitly aimed at environments where dust, humidity or corrosive fumes destroy the boards of an ordinary UPS.
What input voltage range does the UPS tolerate?
304 to 477 V, at a frequency of 45 to 65 Hz. That is a very wide window around the nominal 400 V three-phase: the mains voltage can drop sharply without the UPS switching to its batteries.
What is the power quality at the input and at the output?
Harmonic distortion stays below 3% on both sides — so the UPS does not pollute the upstream grid — and the output voltage is held within ±1.5%. The input power factor reaches 0.99.
Why does this 20 kVA unit really deliver 20 kW?
Because its output power factor is 1: all of the apparent power is available in watts. The UPS also accepts loads with a power factor from 0.9 leading to 0.9 lagging, which covers servers and motors alike.
How much space and weight should you plan for in the electrical room?
A cabinet 140 cm high, 38 cm wide and 92.8 cm deep. Mind the weight: the stated 446 kg does not include the batteries, and the packaged unit weighs 494 kg. Check the floor and the access route to the room before ordering.
How much heat and noise does the UPS produce?
900 W of heat dissipation and a noise level of 60 dBA. These two values call for a dedicated, ventilated electrical room: the 900 W go straight into the calculation of the room's air conditioning.
How do you monitor the Easy UPS 3S remotely?
The unit has a USB port for basic management; network monitoring requires an optional management card, ordered separately. A slot is provided to accommodate it.
Which batteries does this UPS use, and can more be added?
Internal 240 V VRLA batteries, with two pre-installed strings and one free slot for a third. Adding this string is the intended way to extend the runtime beyond the stated quarter of an hour.
Under what conditions can the Easy UPS 3S operate?
Between 0 and 40 °C and up to 95% relative humidity, non-condensing, with an IP20 rating. The maximum short-circuit current withstand is 10 kA, a value to compare with that of the distribution board feeding it.
Is the Easy UPS 3S E3SUPS20KHB1 new and under warranty?
Yes, new equipment, with the invoice serving as the warranty document, for a period of 12 months. The unit is CE, EAC and RCM certified; the datasheet lists all the electrical and environmental values.

Trending

Chat on WhatsApp

Scan with my phone

The simplest way: open your phone camera and point it at this code. The chat opens with your message ready.

Open WhatsApp Web

Works if your phone is already linked to this computer.

Prefer to call? (+212) 05 30 31 64 21