Schneider Electric Easy UPS 3S 20 kW / 20 kVA Online UPS (E3SUPS20KHB1)
Fifteen minutes of runtime at full load, internal batteries included. Dust filter and conformal-coated boards: it is made for demanding premises, on a three-phase 400 V input tolerated from 304 to 477 V.
Runtime: around 15 minutes at full load (20 kW)
Internal batteries included: 2 strings of 7 Ah, expandable to 3 for more runtime
Three-phase 400 V input and output, also 380 or 415 V
Terminal block connection: fixed wiring, to be installed by an electrician
Input voltage accepted from 304 to 477 V
Dust filter and conformal-coated electronic boards for demanding environments
USB port; network management card optional for remote monitoring
Harmonic distortion below 3% on the input as on the output
Output voltage regulated to ±1.5%
Maximum input current of 37 A per phase
Active ventilation: 60 dBA, to be installed in an electrical room
Very high-power three-phase online UPS for critical infrastructure: online double-conversion, 20 kW / 20 kVA. Technology & protection: power is fully regenerated, continuously — equipment never touches the mains, with zero transfer time. Maximum protection against power cuts, surges, voltage fluctuations and electrical noise. Power: 20 kVA for 20 kW of usable power (power factor of 1) — all of the rated power available in watts, for several server racks. Runtime: approx. 15 minutes at full load (20 kW). Ports: three-phase terminal block connection (fixed wiring by an electrician). Designed, for example, for data centres and critical business infrastructure. Remember to check how much power your equipment draws and to choose the capacity according to the runtime you need.
Be the first to review this product and help other customers.
Write a review
Frequently asked questions about this product
How long does the Easy UPS 3S 20 kVA run on battery?
About 15 minutes at full load, i.e. 20 kW, with the internal batteries. This is the runtime stated at maximum load: at partial load it is longer, and the unit accepts an additional battery string to extend it further.
Does the Easy UPS 3S 20 kVA require a three-phase supply?
Yes: input and output are both three-phase, at 400 V — also 380 or 415 V — on a 3-phase + neutral + earth terminal block. Input current reaches 37 A per phase: the feeder circuit at the distribution board and the cable cross-section must be sized accordingly.
What makes this UPS suitable for a harsh room?
A dust filter — included — and coated electronic boards protected by a conformal varnish. Both are explicitly aimed at environments where dust, humidity or corrosive fumes destroy the boards of an ordinary UPS.
What input voltage range does the UPS tolerate?
304 to 477 V, at a frequency of 45 to 65 Hz. That is a very wide window around the nominal 400 V three-phase: the mains voltage can drop sharply without the UPS switching to its batteries.
What is the power quality at the input and at the output?
Harmonic distortion stays below 3% on both sides — so the UPS does not pollute the upstream grid — and the output voltage is held within ±1.5%. The input power factor reaches 0.99.
Why does this 20 kVA unit really deliver 20 kW?
Because its output power factor is 1: all of the apparent power is available in watts. The UPS also accepts loads with a power factor from 0.9 leading to 0.9 lagging, which covers servers and motors alike.
How much space and weight should you plan for in the electrical room?
A cabinet 140 cm high, 38 cm wide and 92.8 cm deep. Mind the weight: the stated 446 kgdoes not include the batteries, and the packaged unit weighs 494 kg. Check the floor and the access route to the room before ordering.
How much heat and noise does the UPS produce?
900 W of heat dissipation and a noise level of 60 dBA. These two values call for a dedicated, ventilated electrical room: the 900 W go straight into the calculation of the room's air conditioning.
How do you monitor the Easy UPS 3S remotely?
The unit has a USB port for basic management; network monitoring requires an optional management card, ordered separately. A slot is provided to accommodate it.
Which batteries does this UPS use, and can more be added?
Internal 240 V VRLA batteries, with two pre-installed strings and one free slot for a third. Adding this string is the intended way to extend the runtime beyond the stated quarter of an hour.
Under what conditions can the Easy UPS 3S operate?
Between 0 and 40 °C and up to 95% relative humidity, non-condensing, with an IP20 rating. The maximum short-circuit current withstand is 10 kA, a value to compare with that of the distribution board feeding it.
Is the Easy UPS 3S E3SUPS20KHB1 new and under warranty?
Yes, new equipment, with the invoice serving as the warranty document, for a period of 12 months. The unit is CE, EAC and RCM certified; the datasheet lists all the electrical and environmental values.
A maintenance bypass supplied as standard allows the UPS to be replaced without shutting down the equipment it powers. Around 15 minutes of runtime at half load (4 000 W), extendable with four battery cabinets.
•Around 15 minutes of runtime at half load (4 000 W)
•Runtime extendable with one to four external battery cabinets
•Internal bypass and maintenance bypass as standard
16 kW genuinely available and around 14 minutes of runtime at half load, extendable with up to four battery cabinets. Terminal block input and output, for hard-wired infrastructure.
•16 kW usable output
•Around 14 minutes of runtime at half load
•Runtime extendable with one to four external battery cabinets
A free-standing tower on castors, with an LCD screen showing the load, the battery status and the voltages. Around 16 minutes of runtime at half load, extendable with up to four battery cabinets.
For a whole infrastructure: 9 minutes of runtime at half load (5000 W) and 5 minutes at 70%, the time it takes to switch over to a generator. 94% efficiency at full load and internal bypass.
All the power available in watts: 10,000 W usable, as many as the VA. Around 7 minutes of runtime at half load (5000 W) to shut down a full rack cleanly, in only 4U.
Network management card already fitted, with environmental monitoring: it is administered and raises alerts remotely. 9 minutes of runtime at 50% load (10 kW), extendable with battery packs.
•Runtime: 9 min at 50% load (10 kW), 5 min at 70% (14 kW)
Doubling the runtime comes down to one extra battery cabinet: 9 minutes at half load become 23 minutes. The 16 12 V batteries are chosen and ordered separately.
Nineteen minutes of runtime at half load, extended to fifty with an additional battery cabinet. The 16 12 V batteries are chosen and ordered separately.
Floor-standing, 68.5 cm high and 54 kg: the tower version, for when there is no rack. Around 11 minutes of runtime at half load (3000 W) and 94% efficiency at full load.
Twenty minutes of runtime at half load (2 400 W), extended to several hours with up to four external battery cabinets. The standard maintenance bypass allows the unit to be swapped without shutting down the equipment.
•Around 20 minutes of runtime at half load (2 400 W)