Schneider Electric Easy UPS 3S Online UPS 30 kW / 30 kVA (E3SUPS30KHB1)
Nine minutes of runtime at full load on its internal batteries, expandable to four strings. Three-phase 400 V input accepted from 304 to 477 V, dust filter and conformal-coated boards for difficult premises.
Runtime: around 9 minutes at full load (30 kW)
Internal batteries included: 2 strings of 7 Ah, expandable to 4 for longer runtime
Three-phase 400 V input and output, also 380 or 415 V
Terminal block connection: fixed wiring, to be installed by an electrician
Input voltage accepted from 304 to 477 V
Dust filter and conformal-coated boards for harsh environments
USB port; optional network management card for remote monitoring
Harmonic distortion below 3% on input as on output
Output voltage regulated to ±1.5%
Maximum input current of 55 A per phase
Active ventilation: 63 dBA, to be installed in an electrical room
A very high-power three-phase online UPS for critical infrastructure: online double conversion, 30 kW / 30 kVA. Technology & protection: power is fully and continuously regenerated — your equipment never touches the mains, with no transfer time whatsoever. Maximum protection against outages, surges, voltage fluctuations and electrical noise. Power: 30 kVA for 30 kW of real power (power factor close to 1) — all of the rated power available in watts, for a data centre. Runtime: about 9 minutes at full load (30 kW). Ports: three-phase terminal block connection (hard-wired by an electrician). Designed, for example, for data centres and critical business infrastructure. Remember to check how much power your equipment draws and to choose the rating according to the runtime you need.
Be the first to review this product and help other customers.
Write a review
Frequently asked questions about this product
How long does the 30 kVA Easy UPS 3S run on battery?
About 9 minutes at full load, i.e. 30 kW, with its two internal 7 Ah battery strings. The unit accepts up to four strings: this is the intended way to extend the runtime.
Does the 30 kVA Easy UPS 3S require a three-phase supply?
Yes: both input and output are three-phase at 400 V — or 380 or 415 V — on a 3-phase + neutral + earth terminal block. Input current reaches 55 A per phase: the circuit at the distribution board must be sized accordingly.
What makes this UPS suitable for a harsh environment?
A dust filter and conformally coated circuit boards. These two features are explicitly aimed at environments where dust, humidity or corrosive fumes destroy the boards of an ordinary UPS.
What input voltage range does the UPS tolerate?
304 to 477 V, at a frequency of 45 to 65 Hz. This is a very wide window around the nominal 400 V: the mains can drop sharply without the UPS switching to its batteries.
What is the power quality like at both input and output?
Harmonic distortion stays below 3% on both sides, and output voltage is held within ±1.5%. The power factor reaches 0.99: the UPS does not pollute the upstream grid.
Does this 30 kVA unit really deliver 30 kW?
Yes: the 30 kVA equals 30 kW, i.e. an output power factor of 1. All the apparent power is available in watts, which is not the case with UPS units where the gap reaches 30 to 40%.
How much space and weight should you allow for in the room?
A cabinet 140 cm high, weighing 368 kg without batteries. Check the floor, the door and the route to the electrical room before ordering: this is not a unit you move afterwards.
How do you monitor the 30 kVA Easy UPS 3S remotely?
The unit provides a USB port for basic management; network monitoring requires an optional management card, to be ordered separately.
Is the Easy UPS 3S E3SUPS30KHB1 new and under warranty?
Yes, new equipment, with the invoice serving as the warranty document for 1 year. Its noise level of 63 dBA and active ventilation make it suited only to a dedicated electrical room. The datasheet covers the rest.
Network management card already fitted, with environmental monitoring: it is administered and raises alerts remotely. 9 minutes of runtime at 50% load (10 kW), extendable with battery packs.
•Runtime: 9 min at 50% load (10 kW), 5 min at 70% (14 kW)
•An external battery pack is included; runtime remains extendable
•Network Management Card 3 pre-installed, with environmental monitoring
Fifteen minutes of runtime at full load, internal batteries included. Dust filter and conformal-coated boards: it is made for demanding premises, on a three-phase 400 V input tolerated from 304 to 477 V.
Power factor of 1: all 8 000 W stated are available. Ten battery-backed outlets, four of them heavy-duty 16 A, and the Web/SNMP network management card is included.
•8 000 W usable output (power factor of 1)
•6 C13 outlets, the format used by computer and server power cords, all battery-backed
•4 C19 outlets, heavy-duty 16 A, also battery-backed
Ten battery-backed outlets, four of them heavy-duty 16 A, for 4 500 W usable and around 11 minutes of runtime at half load (2 250 W). The Web/SNMP management card is included.
•4 500 W usable output (power factor of 0.9)
•Around 11 minutes of runtime at 50% load (2 250 W), 7 minutes at 70% (3 150 W)
•6 C13 outlets, the format used by computer and server power cords, all battery-backed
16 kW genuinely available and around 14 minutes of runtime at half load, extendable with up to four battery cabinets. Terminal block input and output, for hard-wired infrastructure.
•16 kW usable output
•Around 14 minutes of runtime at half load
•Runtime extendable with one to four external battery cabinets
A free-standing tower on castors, with an LCD screen showing the load, the battery status and the voltages. Around 16 minutes of runtime at half load, extendable with up to four battery cabinets.
•Around 16 minutes of runtime at half load
•Runtime extendable with one to four external battery cabinets
Three reinforced 16 A outlets for power-hungry hardware, eight server outlets, and batteries that are changed without cutting the power. Under 40 dB at one metre, in a rack as in a tower.
•8 C13 outlets: the format of computer and server power cords
All the power available in watts: 10,000 W usable, as many as the VA. Around 7 minutes of runtime at half load (5000 W) to shut down a full rack cleanly, in only 4U.
For a whole infrastructure: 9 minutes of runtime at half load (5000 W) and 5 minutes at 70%, the time it takes to switch over to a generator. 94% efficiency at full load and internal bypass.
A maintenance bypass supplied as standard allows the UPS to be replaced without shutting down the equipment it powers. Around 15 minutes of runtime at half load (4 000 W), extendable with four battery cabinets.
•Around 15 minutes of runtime at half load (4 000 W)
•Runtime extendable with one to four external battery cabinets
•Internal batteries included: 2 strings of 7 Ah, expandable to 3 for more runtime
•Three-phase 400 V input and output, also 380 or 415 V
In stock
92 399 DHincl. VAT92 399,00 DHincl. VAT
Delivery everywhereDelivered all over Morocco
In stock
65 999 DHincl. VAT65 999,00 DHincl. VAT
Delivery everywhereDelivered all over Morocco
In stock
51 199 DHincl. VAT51 199,00 DHincl. VAT
Delivery everywhereDelivered all over Morocco
49 999 DHincl. VAT49 999,00 DHincl. VAT
Delivery everywhereDelivered all over Morocco
•Internal bypass and maintenance bypass as standard
In stock
41 999 DHincl. VAT41 999,00 DHincl. VAT
Delivery everywhereDelivered all over Morocco
•3 C19 outlets: reinforced 16 A outlets for power-hungry equipment
•Terminal block input: fixed wiring, to be installed by an electrician
A maintenance bypass supplied as standard allows the UPS to be replaced without shutting down the equipment it powers. Around 15 minutes of runtime at half load (4 000 W), extendable with four battery cabinets.
•Around 15 minutes of runtime at half load (4 000 W)
•Runtime extendable with one to four external battery cabinets
•Internal bypass and maintenance bypass as standard
16 kW genuinely available and around 14 minutes of runtime at half load, extendable with up to four battery cabinets. Terminal block input and output, for hard-wired infrastructure.
•16 kW usable output
•Around 14 minutes of runtime at half load
•Runtime extendable with one to four external battery cabinets
A free-standing tower on castors, with an LCD screen showing the load, the battery status and the voltages. Around 16 minutes of runtime at half load, extendable with up to four battery cabinets.
For a whole infrastructure: 9 minutes of runtime at half load (5000 W) and 5 minutes at 70%, the time it takes to switch over to a generator. 94% efficiency at full load and internal bypass.
Fifteen minutes of runtime at full load, internal batteries included. Dust filter and conformal-coated boards: it is made for demanding premises, on a three-phase 400 V input tolerated from 304 to 477 V.
All the power available in watts: 10,000 W usable, as many as the VA. Around 7 minutes of runtime at half load (5000 W) to shut down a full rack cleanly, in only 4U.
Network management card already fitted, with environmental monitoring: it is administered and raises alerts remotely. 9 minutes of runtime at 50% load (10 kW), extendable with battery packs.
•Runtime: 9 min at 50% load (10 kW), 5 min at 70% (14 kW)
Doubling the runtime comes down to one extra battery cabinet: 9 minutes at half load become 23 minutes. The 16 12 V batteries are chosen and ordered separately.
Nineteen minutes of runtime at half load, extended to fifty with an additional battery cabinet. The 16 12 V batteries are chosen and ordered separately.
Floor-standing, 68.5 cm high and 54 kg: the tower version, for when there is no rack. Around 11 minutes of runtime at half load (3000 W) and 94% efficiency at full load.